HomeInstallationDustless SandingRecoat $0.99 sfAbout Us

Our design consultant will arrive at your home with wood samples to help you select a new hardwood floor that will compliment the style of your home and furnishings.  We recommend the installation of solid "unfinished" wood.

.

webassets/hardwood-floor-supply.jpg
Solid Wood, is milled from a single 3/4" thick piece of hardwood.It expands and contracts with changes in humidity.  A solid hardwood floor can be sanded and refinished over several generations of use. Damaged boards can usually be repaired, rather than replaced. Solid wood is available either "unfinished" or "prefinished".  Unfinished wood is installed, then sanded, stained and finished with polyurethane. Prefinished wood is stained and finished at a factory.  

Engineered Wood, is manufactured by compressing several layers of hardwood together with a thin veneer on top.  We do not install engineered wood.

Installation: Wood will be delivered to your home five to seven days in advance of your scheduled installation.  The wood must be placed inside the home to allow the wood to acclimate to the humidity level in your home.  This will prevent buckling, cupping or warping of floor.  On unfinished wood, dustless sanding, staining and the application of the 1st coat of polyurethane will be done the same day, or the next day, depending on the size of the installation.  The second coat of polyurethane will be applied one to two days later.  You will be able to walk on your new floor eight to 12 hours after the polyurethane has been applied.   

webassets/eng2.jpg
Engineered Wood